Things are moving right along with the house. The crew worked right through Memorial Day weekend to lay the floor joists, some plumbing (mostly drainage) and get the frame up:


June 1st saw the rafters and roof sheathing go up. It's starting to look like a real house!


This past week has seen the rain gutters added; they are all connected and attached to a huge drainage pipe directed several yards away from the house, which I think is fantastic. In the future the pipe will either get hooked up to a water storage container or empty into a pond.
The shingles were put on, and Aidan got to assist the builder, Darin Baker, staple a few areas of Tyvek wrap with a staple hammer, which was quite the thrill for him.
The electrical and plumbing both have been roughed in, and the following have been installed: the heaters(zonal fan type, which I'm really happy about and hope they are as neat as they sound), shower, tub, and exhaust fan piping.
We visited today and Darin had finished the wrapping and was installing the windows.


We are responsible for clean-up and the boys have been a huge help sorting through piles of rubbish and sorting it all out. I hate all the trash, but we were able to recycle quite a bit, used the cardboard to supress weeds in my future garden area, and we have a huge pile of solid wood scraps for future projects, namely a tree house. I even used quite a few scraps to make a chicken coop extension and the building superintendant, Eric Sundby, came out and used leftovers to build us a shed/well pumphouse. It's not in his contract to do so, but he did. I was quite surprised to see him out there contructing and grateful to have such a great guy supervising our project.